Posted on
5/5 - (1 vote)

[2026] Project-Planning-Design Answers Project-Planning-Design Free Demo Are Based On The Real Exam

Project-Planning-Design [Apr-2026 Newly Released] Exam Questions For You To Pass

QUESTION 12
An architect is commissioned to design a lodge in a location where the water service is insufficient for a sprinkler system. The architect plans to maximize sight lines by using exposed columns and roof structure in the primary assembly space.
Which of the following systems meet these requirements? Check the three that apply.

 
 
 
 
 
 

QUESTION 13
A church congregation has hired an architect to help them determine the feasibility of converting a retail strip mall space into a new church. The space is 30′ wide and 125′ long and is in an interior location with tenants on both long sides. The client has requested the following:
Natural light into the central gathering space
Nursery space for young children
Church office space
Adequate restrooms
Visually appealing landscaping
Which of the following should the architect consider to help determine if the project can move forward?
Check the three that apply.

 
 
 
 
 
 

QUESTION 14
An architect has just received client approval of the Schematic Design documents for a three-story, outpatient medical clinic. The clinic is located within a mixed-use development governed by a City-approved Planned Development (PD) document. The medical clinic design utilizes standardized departmental layouts and includes outpatient clinics, as well as treatment spaces, administrative spaces and public/lobby spaces.
The site needs to accommodate four different vehicular traffic flows: patient traffic, staff traffic, service and delivery traffic, and emergency services traffic. In addition, a pedestrian plaza must connect to the mixed-use development sidewalks. The plaza must provide space for bicycle parking and will serve as the future bus stop.
The site design addresses several challenges related to building orientation. The southeast facade, with excellent visibility from the highway, is the location of all service equipment. The building entrance faces northwest, convenient to the parking but not visible from the highway.
The client believes future patient volumes will outgrow the clinic. The PD document allows for a planned Phase 2 development on the adjacent vacant site to the southwest. Phase 2 would include a second building (2 story, 80,000 BGSF) and/or a parking deck.
Other considerations for the project include:
* Protected tree requirements are defined in the PD document.
* Easy pedestrian access must be provided from Sycamore Boulevard.
* All required parking for the clinic must be accommodated on site.
* Programmed area includes 109,450 Departmental Gross Square Feet (DGSF) / 130,184 Building Gross Square Feet (BGSF).
* Exterior material percentages are dictated by the PD document and shall not exceed specific percentages for Primary and Secondary Finishes.
* All service equipment needs to be screened; see PD document for restrictions.
* Signage opportunities are important to the client.
* Acoustical privacy is a concern of the healthcare system.
The following resources are available for your reference:
* Drawings, including a perspective, plans, and exterior elevations
* Building Program, including client’s departmental program and detailed program for Treatment 01 (Infusion)
* Exterior Material Cost Comparisons
* Planned Development Document
* IBC Excerpts, showing relevant code sections
* ADA Excerpts, showing relevant sections from the ADA Standards for Accessible Design During the city planning review process, the city planner discovers that two of the building elevations deviate from the building design requirements set forth in the Planned Development Document. The owner is granted a variance for only one of the non-compliant facades. The facade must face the Pedestrian Access Easement.

 
 
 
 

QUESTION 15
Which statement accurately describes the use of an electrical conduit?

 
 
 
 

QUESTION 16

Refer to the exhibit (lighting fixtures with Kelvin temperatures and CRI values).
An architect is evaluating downlighting for a new restaurant. The owner requests the lighting cast a warm light, be energy efficient, and allow for the colors of the chef’s food to accurately appear while guests are seated.
What fixture manufacturer satisfies the owner’s request?

 
 
 
 

QUESTION 17
In the design of a project, the architect should do which of the following in order to respond to the requirements imposed by governmental authorities that have jurisdiction over the project?

 
 
 
 

QUESTION 18
During design development of a new college laboratory facility, the owner asks the architect to include way- finding signage mounted adjacent to doors. The type of signage requested will project into the corridors of the building.
Which of the following should the architect consider when selecting the signage? Check the three that apply.

 
 
 
 
 
 

QUESTION 19
A multistory warehouse is to be converted into a high-tech office building. The owners propose a variety of services and flexibility to tenants, including cable/internet, fiber optic communications, dish/satellite, and security systems.
In order to accommodate this broad array of electronic and communications services, the architect should recommend which of the following electrical and communications distribution systems?

 
 
 
 

QUESTION 20

Refer to the exhibit (concrete rigid frame building with aluminum curtain wall system).
The drawing shows a proposed concrete rigid frame building enclosed in an aluminum curtain wall system.
To save money, the contractor proposed to eliminate the curtain wall system and substitute steel stud framing, which is anchored between the columns and beams and covered with a stucco finish.
What is the most likely result of this substitution?

 
 
 
 

QUESTION 21
Which existing site elements are most important to locate in preparing a schematic design phase site plan for an adaptive reuse project?

 
 
 

QUESTION 22
An elementary school requires a renovation, selective demolition, and a major addition in order to accommodate a growing student population. An architectural firm has prepared schematic design plans incorporating the school’s increased programmatic needs, including an enlarged library, cafeteria, and gymnasium; a secure courtyard; and additional space for administrative offices and classrooms. The main entrance was relocated in order to improve the traffic and pedestrian flow at the beginning and end of the school day, and additional parking was provided to comply with current zoning requirements.
The existing single-story masonry building was built in 1950. Two small additions were built later: the north addition will be kept and repurposed, but the south addition will be demolished. The building contains asbestos and lead in roof soffits, floor tiles, pipe insulation, and window paint. All existing mechanical systems need to be replaced; new systems have not been selected.
Considerations for the renovation include:
*The relocated front entrance must be easily recognizable, highly visible, and secure.
*Interior and exterior materials need to be durable and maintainable in order to withstand frequent student abuse, but also economical due to strict budget limitations.
*Good indoor air quality and increased energy efficiency are priorities for the selection of mechanical equipment.
After completion, the entire school should look uniform, without a distinctive difference between the existing building and new addition.
Building information:
*Construction Type is II-B.
The following resources are available for your reference:
*Existing Plans, including site and floor plans
*Proposed Plans, including site and floor plans
*Cost Analysis
*Zoning Ordinance Excerpts, for off-street parking requirements
*IBC Excerpts, showing relevant code sections
*ADA Standards Excerpts, showing relevant sections from the ADA Standards for Accessible Design An elementary school library has an occupancy load of 150.
What is the minimum clear opening width required?

 
 
 

QUESTION 23
A new four-story apartment building is being designed on a site that has solid bedrock subsurface conditions.
The client requested the lowest cost of installation, highest energy efficiency, the shortest round trip time, and minimized loss of usable building space.
Which elevator type should the architect recommend?

 
 
 
 

QUESTION 24
An existing building containing the maximum allowable area may be extended horizontally provided the extension is separated from the existing building by which one of the following?

 
 
 
 

QUESTION 25
A one-story residence in a dry climate with cold winter nights is designed with an unconditioned dirt floor crawlspace utilizing underfloor plumbing and HVAC ductwork. The owner is interested in using a concrete slab-on-grade floor instead of the pier-and-beam concrete floor over an open crawlspace as originally designed.
What are the impacts of changing the design to a slab-on-grade floor system? Check the two that apply.

 
 
 
 
 
 

QUESTION 26
An architect is selecting a mechanical system for the first floor of a hotel in a temperate climate. They must consider the following:
* The building footprint covers 95% of the small urban site.
* The first floor has an open floor plan that includes a lobby, bar, and restaurant.
* The plan can only accommodate one 500 sf mechanical room.
What mechanical system should the architect recommend?

 
 
 

QUESTION 27
Click in the structural bay of the elevation that is the most appropriate location to install steel rod cross bracing.

QUESTION 28
Refer to the exhibit (residential floor plan with three outlined elevator core locations A, B, C).

During design development, an owner has chosen an elevator that does not fit in the location previously selected for the two-car elevator core. The elevator core should be near the main entrance lobby and centrally located. The minimum program requirements for each residential floor are the following:
One bicycle room
Five studios
Five 1-bed units
Eight 2-bed units
Three 3-bed units
Which outlined location meets the requirements?

 
 
 

QUESTION 29
According to model codes, wind pressure can be positive on the roof of a low-rise building when wind is which one of the following?

 
 
 
 

QUESTION 30
For a three-story building, which of the following is considered a vertical irregularity with respect to seismic design?

 
 
 
 

QUESTION 31
An elementary school requires a renovation, selective demolition, and a major addition in order to accommodate a growing student population. An architectural firm has prepared schematic design plans incorporating the school’s increased programmatic needs, including an enlarged library, cafeteria, and gymnasium; a secure courtyard; and additional space for administrative offices and classrooms. The main entrance was relocated in order to improve the traffic and pedestrian flow at the beginning and end of the school day, and additional parking was provided to comply with current zoning requirements.
The existing single-story masonry building was built in 1950. Two small additions were built later: the north addition will be kept and repurposed, but the south addition will be demolished. The building contains asbestos and lead in roof soffits, floor tiles, pipe insulation, and window paint. All existing mechanical systems need to be replaced; new systems have not been selected.
Considerations for the renovation include:
*The relocated front entrance must be easily recognizable, highly visible, and secure.
*Interior and exterior materials need to be durable and maintainable in order to withstand frequent student abuse, but also economical due to strict budget limitations.
*Good indoor air quality and increased energy efficiency are priorities for the selection of mechanical equipment.
After completion, the entire school should look uniform, without a distinctive difference between the existing building and new addition.
Building information:
*Construction Type is II-B.
The following resources are available for your reference:
*Existing Plans, including site and floor plans
*Proposed Plans, including site and floor plans
*Cost Analysis
*Zoning Ordinance Excerpts, for off-street parking requirements
*IBC Excerpts, showing relevant code sections
*ADA Standards Excerpts, showing relevant sections from the ADA Standards for Accessible Design The project team decides to cover the roof area above the gymnasium and platform with 350 watt, stationary, photovoltaic (PV) panels. Each panel requires 20 square feet, accounting for access aisles and safety clearances. The PV system will be tied to the local power company’s electrical grid, and will not have battery storage. The school is located in a region that gets an average of 4 usable hours of sunlight per day.
Which of the following PV system design considerations apply to this project? Check the three that apply.
Refer to the project involving an elementary school renovation and addition with photovoltaic (PV) panels on the gymnasium roof (350-watt panels, 20 sq ft each, ~4 usable sunlight hours/day). The PV system is grid-tied without battery storage.
Which of the following PV system design considerations apply? Check the three that apply.

 
 
 
 
 
 

QUESTION 32
Which of the following is the most appropriate action for the architect to take in preparing a construction cost estimate for an owner after completing the schematic design phase?

 
 
 
 

QUESTION 33
Comprehensive recycling of materials from building demolition is primarily limited by which one of the following?

 
 
 
 

New 2026 Realistic Free NCARB Project-Planning-Design Exam Dump Questions and Answer: https://www.passleadervce.com/Architect-Registration-Examination/reliable-Project-Planning-Design-exam-learning-guide.html

         

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt www.stes.tyc.edu.tw myportal.utt.edu.tt

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below